Shandong Prima Construction Formwork Co., Ltd.

Diamond Member  Since 2024

Suppliers with verified business licenses

Single Category Products

Double-row Products

SCFFOLDING SYSTEM
SCFFOLDING SYSTEM
The ONLY Chinese Ringlock Scaffolding which has RISE Certificate as per European standard and reached the same superior quality level as Top 2 German manufacturers
CONCRETE CONSTRUCTION FORMWORK SYSTEM
CONCRETE CONSTRUCTION FORMWORK SYSTEM
Green Formwork is a fast and cost-effective hand-set formwork shoring system for concrete construction.It is a perfect solution for PT flatslab structure,can save time and reduce cost for your projects.The technology of Panel-Prop Early Stripping System is from Canada,we are the sole manufacturer in China,we got invention patent in United States,Australia,and registered brand in United States and European Uinon. We have confidence that it's the most advanced Early stripping Shoring System in all of the world.Till now,it has been used in U.S.A.,Canada,Czekh republic,U.A.E,Malaysia,Indonesia,Philippines,Thailand,Burma,Cambodia.
FORMWORK&SCAFFOLDING ACCESSORIES
FORMWORK&SCAFFOLDING ACCESSORIES
The first Chinese company which manufactured and exported to UK with scaffold fittings(Couplers ) in early 1993; ScaffoldingCouplers are made according to BS1139/EN74/EN74B/EN74BB and Australian standard :AS1576…;
Main Title
Main Title
Subtitle
Main Title
Main Title
Subtitle
Main Title
Main Title
Subtitle
ALUMINUM GREEN FORMWORK
ALUMINUM GREEN FORMWORK
500 Square Meter (MOQ)
STEEL GREEN FORMWORK
STEEL GREEN FORMWORK
Panel-Prop Early Stripping System
WALL/COLUMN FORMWORK
WALL/COLUMN FORMWORK
HUNNEBECK

Multi Categories Products

Company Profile
factory video
Show the capacity of your company will help to attract buyers quickly. The suggested contents include: enterprise scale/numbers of employees/technical patents/successful cases/international after-sale service etc...

COMPANY PROFILE

Shandong Prima Construction Formwork Co., Ltd. is the biggest manufacturer and supplier of scaffolding and formwork systems in China. We have the advanced forging, casting, punching, welding, colding forming and surface treatment lines in workshops.

All of our scaffolding couplers/clamps are made as per BS1139(1982&1991) and EN74/EN74B. The quality of our products is as good as that made in U. K., but the price is more competitive.

We started to supply U. K. Market with scaffolding couplers/clamps in the year 1993, and now we export our products to most European countries, such as U. K., France, Spain, Portugal, Italy, Greece, Norway, Denmark, Finland, etc. We also supply the following countries with our products: Canada, U. S. A., Brazil, Australia and New Zealand, etc. And we have gained international reputations as a preferred supplier for projects both large and small. Our products are used with complete confidence worldwide in construction, power stations and petrochemical and oil related industries, and many more applications where safe access is required.

After ten years efforts, now we can supply the full range of scaffolding couplers/clamps for every country, and we have the official certificates from U. K. And from Australia for our scaffolding couplers/clamps. We can supply various products for scaffolding, construction and formwork fields, made of forged carbon steel, pressed carbon steel, cast carbon steel.

We can also supply the Ring system scaffolds, the cup-lock system scaffolds, the Kwikstage system scaffolds, and the Euro system scaffolds. We also supply scaffold frames, screw base jacks, formwork accessories, some construction tools, etc.

For formowrks, we began to produce slab formwork in 2012 and then we expanded to produce column/wall formowrk, etc.

Especially, Our Green Formwork is patented product with technology from Canada"TABLA", with drop head mechanism, is the most advanced, the most safest(6directions fixed) and the fastest slab formwork in the world! Patented in USA, Australia, China, Malaysia...

It has unbeatable advantages.

SAFE -The independent table with 6 directions moving restriction. It′s a very stable system.

EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism, it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.

REDUCED TOTAL COST - Thanks to the early stripping mechanism, the number of panels becomes less and the cost, transportation and storage is reduced.

MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

If you are interested in our products, please contact us, we will do our best to cooperate with you.
Authentication
Business Type: Manufacturer/Factory
Registered Capital: 20000000 RMB
Plant Area: >2000 square meters
Management System Certification: ISO 9001
Average Lead Time: Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Solutions
OEM/ODM
OEM/ODM
Factory Tour
Factory Tour
Sample Order
Sample Order

Send your message to this supplier

*From:
*To:
avatar Mr. Jack Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now