Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. Ideal for concrete slab and ceiling construction.
Discover the 3 key elements of the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd.: a panel with plywood on a steel frame and a prop with early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The SAFE table from Shandong Prima Construction Formwork Co., Ltd. offers independent table movement in 6 directions, providing exceptional stability.
EFFICIENT: This system is designed with minimal components for easy set-up and removal. The early stripping mechanism reduces construction time, enhancing efficiency.
REDUCED TOTAL COST: The innovative early stripping mechanism decreases the number of panels required, leading to cost savings in transportation and storage.
MINIMUM OPERATORS: With only 3-4 workers needed, setting up and removing panels is quick and straightforward.
VERSATILE DESIGN: The system can handle complex slab structures effortlessly through the combination of panels, auxiliary beams, and bridge beams.
Contact us for Q355b Table Formwork for your building projects. Quality construction solutions by Shandong Prima Construction Formwork Co., Ltd.