• Building Construction Formwork Panel System
  • Building Construction Formwork Panel System
  • Building Construction Formwork Panel System
  • Building Construction Formwork Panel System
  • Building Construction Formwork Panel System
  • Building Construction Formwork Panel System

Building Construction Formwork Panel System

Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Slab Formwork
Payment Term: 30% Deposit,70% Should Be Paid Before Shipment
Panel and Prop Raw Material: Q355b
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • Installation Instructions
  • Certifications
Overview

Basic Info.

Model NO.
GF
Trade Mark
GF
Color
Green/Customized Color
HS
8480600000
Transport Package
Bundle
Trademark
GF
Origin
China
HS Code
8480600000
Production Capacity
50000piece Per Year

Product Description

Steel Formwork Panel System


Discover the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. for efficient building construction. Lightweight, high-strength, and eco-friendly solution for all your formwork needs.

Product Description

Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on steel frames and props with early stripping mechanism. Ideal for efficient building construction.

Building Construction Formwork Panel System
Product Parameters
Model Number Size(mm) weight(kgs)
MB1812 1800x1200 45
MB189 1800X900 39
MB186 1800X600 31
MB1512 1500X1200 41.4
MB159 1500X900 33.3
MB156 1500X600 25.8
MB1212 1200X1200 34
MB129 1200X900 28
MB126 1200X600 23
MB99 900X900 23
MB96 900X600 19
MB66 600X600 14.3
Our Advantages



SAFE Formwork System



SAFE Formwork System


Introducing the SAFE Formwork System by Shandong Prima Construction Formwork Co., Ltd.



Key Features:



  • Stability: Independent table with 6 directions moving restriction for a very stable system.

  • Efficiency: Few components for simple set-up and removal. Early stripping mechanism shortens construction period.

  • Cost-Effective: Early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.

  • Minimal Operators: 3-4 workers can quickly and easily set up and remove panels.

  • Versatile: Handles complex slab structures with a combination of panels, aux beams, and bridge beams.




Building Construction Formwork Panel System
Packaging & Shipping
Building Construction Formwork Panel System
Building Construction Formwork Panel System
Building Construction Formwork Panel System
Installation Instructions
Building Construction Formwork Panel System
Certifications
Building Construction Formwork Panel System
Building Construction Formwork Panel System

Contact Shandong Prima Construction Formwork Co., Ltd. for Building Construction Formwork Panel System solutions. We offer customized, high-quality, and cost-effective formwork panels for your projects.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
20000000 RMB
Plant Area
>2000 square meters