Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. Ideal for concrete construction projects.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on steel frames and props with early stripping mechanisms.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, cutting costs in transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly set up and remove panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a straightforward manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for Table Formwork System for Concrete projects.