• Durable Table Formwork for Concrete Construction
  • Durable Table Formwork for Concrete Construction
  • Durable Table Formwork for Concrete Construction
  • Durable Table Formwork for Concrete Construction
  • Durable Table Formwork for Concrete Construction
  • Durable Table Formwork for Concrete Construction

Durable Table Formwork for Concrete Construction

Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Slab Formwork
Payment Term: 30% Deposit,70% Should Be Paid Before Shipment
Panel and Prop Raw Material: Q355b
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • Installation Instructions
  • Certifications
Overview

Basic Info.

Model NO.
GF
Trade Mark
GF
Color
Green/Customized Color
HS
8480600000
Transport Package
Bundle
Trademark
GF
Origin
China
HS Code
8480600000
Production Capacity
50000piece Per Year

Product Description

Shandong Prima Construction Formwork Co., Ltd. offers the durable Table Formwork for concrete construction. Ideal for building concrete slabs efficiently.

Product Description

Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on a steel frame and props with early stripping mechanism.

Durable Table Formwork for Concrete Construction
Product Parameters
Model Number Size(mm) weight(kgs)
MB1812 1800x1200 45
MB189 1800X900 39
MB186 1800X600 31
MB1512 1500X1200 41.4
MB159 1500X900 33.3
MB156 1500X600 25.8
MB1212 1200X1200 34
MB129 1200X900 28
MB126 1200X600 23
MB99 900X900 23
MB96 900X600 19
MB66 600X600 14.3
Our Advantages



Product Description



SAFE: The SAFE table by Shandong Prima Construction Formwork Co., Ltd. offers independent movement in 6 directions, providing exceptional stability.



EFFICIENT: This system is designed with minimal components for easy setup and removal. The early stripping mechanism reduces construction time significantly.



REDUCED TOTAL COST: With the early stripping mechanism, fewer panels are needed, leading to cost savings in transportation and storage.



MINIMUM OPERATORS: A team of 3-4 workers can efficiently handle panel setup and removal.



VERSATILE DESIGN: The system can handle complex slab structures with ease through the combination of panels, auxiliary beams, and bridge beams.




Durable Table Formwork for Concrete Construction
Packaging & Shipping
Durable Table Formwork for Concrete Construction
Durable Table Formwork for Concrete Construction
Durable Table Formwork for Concrete Construction
Installation Instructions
Durable Table Formwork for Concrete Construction
Certifications
Durable Table Formwork for Concrete Construction
Durable Table Formwork for Concrete Construction

Contact us for durable table formwork for concrete construction projects.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
20000000 RMB
Plant Area
>2000 square meters