Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the Green Formwork System by Shandong Prima. Ideal for building construction, this steel formwork ensures efficient concrete slab and ceiling construction.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring steel panel table formwork with plywood facing and early stripping prop mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - This system includes only a few components, making set-up and removal simple. With an early stripping mechanism, it can shorten the construction period and save time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels needed, resulting in cost, transportation, and storage savings.
MINIMUM OPERATORS - With only 3-4 workers in a team, setting up and removing the panels is quick and easy.
Through the combination of panels, aux beams, and bridge beams, this system can handle complex slab structures in a simple way.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for Steel Panel Table Formwork for Concrete projects.