Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
GF Early Stripping Head Formwork Panel by Shandong Prima. Ideal for concrete slab and ceiling construction. High-quality steel formwork system.
Discover the Green Formwork System's components: a steel-framed panel with plywood and an early stripping prop mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, cutting costs in transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system handles complex slab structures in a simple way.
Company name: 'Shandong Prima Construction Formwork Co., Ltd.'
Contact Shandong Prima Construction Formwork Co., Ltd. for GF Early Stripping Head Formwork Panels for your construction projects.