Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the innovative Green Formwork System by Shandong Prima. Ideal for construction projects, this steel formwork ensures efficient and reliable concrete slab and ceiling construction.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring a panel with plywood on a steel frame and a prop with an early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT: With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs in transportation and storage.
MINIMUM OPERATORS: A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for Building Material Table Formwork Panel solutions for your construction projects.