• Building Material Table Formwork Panel
  • Building Material Table Formwork Panel
  • Building Material Table Formwork Panel
  • Building Material Table Formwork Panel
  • Building Material Table Formwork Panel
  • Building Material Table Formwork Panel

Building Material Table Formwork Panel

Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Slab Formwork
Payment Term: 30% Deposit,70% Should Be Paid Before Shipment
Panel and Prop Raw Material: Q355b
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • Installation Instructions
  • Certifications
Overview

Basic Info.

Model NO.
GF
Trade Mark
GF
Color
Green/Customized Color
HS
8480600000
Transport Package
Bundle
Trademark
GF
Origin
China
HS Code
8480600000
Production Capacity
50000piece Per Year

Product Description

Building Material Table Formwork Panel


Discover the innovative Green Formwork System by Shandong Prima. Ideal for construction projects, this steel formwork ensures efficient and reliable concrete slab and ceiling construction.

Product Description

Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring a panel with plywood on a steel frame and a prop with an early stripping mechanism.

Building Material Table Formwork Panel
Product Parameters
Model Number Size(mm) weight(kgs)
MB1812 1800x1200 45
MB189 1800X900 39
MB186 1800X600 31
MB1512 1500X1200 41.4
MB159 1500X900 33.3
MB156 1500X600 25.8
MB1212 1200X1200 34
MB129 1200X900 28
MB126 1200X600 23
MB99 900X900 23
MB96 900X600 19
MB66 600X600 14.3
Our Advantages



Product Description



SAFE: The independent table with 6 directions moving restriction provides a very stable system.



EFFICIENT: With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.



REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs in transportation and storage.



MINIMUM OPERATORS: A team of 3-4 workers can quickly and easily set up and remove the panels.



Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.



Company Name: Shandong Prima Construction Formwork Co., Ltd.




Building Material Table Formwork Panel
Packaging & Shipping
Building Material Table Formwork Panel
Building Material Table Formwork Panel
Building Material Table Formwork Panel
Installation Instructions
Building Material Table Formwork Panel
Certifications
Building Material Table Formwork Panel
Building Material Table Formwork Panel

Contact Shandong Prima Construction Formwork Co., Ltd. for Building Material Table Formwork Panel solutions for your construction projects.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
20000000 RMB
Plant Area
>2000 square meters