Warranty: | One Year |
---|---|
Certification: | ISO, CE |
Material: | Steel |
Type: | Slab Formwork |
Payment Term: | 30% Deposit,70% Should Be Paid Before Shipment |
Panel and Prop Raw Material: | Q355b |
Customization: |
---|
Suppliers with verified business licenses
Discover the innovative GF Concrete Formwork for efficient construction. Ideal for slab ceilings, this early stripping system enhances building processes.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on steel frames and props with early stripping mechanisms.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, cutting costs in transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly set up and remove panels.
Through the combination of panels, aux beams, and bridge beams, the system handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for GF Early Stripping Concrete Formwork for your projects.
Suppliers with verified business licenses