Warranty: | One Year |
---|---|
Certification: | ISO, CE |
Material: | Steel |
Type: | Slab Formwork |
Payment Term: | 30% Deposit,70% Should Be Paid Before Shipment |
Panel and Prop Raw Material: | Q355b |
Customization: |
---|
Suppliers with verified business licenses
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring a panel with plywood on a steel frame and a prop with early stripping mechanism. Perfect for concrete slab and ceiling table formwork.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company name: Shandong Prima Construction Formwork Co., Ltd.
For all your construction projects, reach out to Shandong Prima Construction Formwork Co., Ltd. for our GF Trade Mark Concrete Formwork Panel.
Suppliers with verified business licenses