Concrete Slab Steel Construction Material Formwork Panels
| Customization: | Available |
|---|---|
| Warranty: | One Year |
| Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Find Similar Products
Basic Info.
- Model NO.
- GF
- Material
- Steel
- Type
- Slab Formwork
- Payment Term
- 30% Deposit,70% Should Be Paid Before Shipment
- Panel and Prop Raw Material
- Q355b
- Trade Mark
- GF
- Color
- Green/Customized Color
- HS
- 8480600000
- Transport Package
- Bundle
- Trademark
- GF
- Origin
- China
- HS Code
- 8480600000
- Production Capacity
- 50000piece Per Year
Product Description
Introducing the Q355b Steel Panel Building Formwork System by Shandong Prima Construction Formwork Co., Ltd.
This innovative system is perfect for concrete construction projects, offering efficiency and reliability for outstanding results. The Q355b Steel Panel Building Formwork System is designed to streamline the construction process, providing a durable and versatile solution for various building projects.
Introducing the revolutionary Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. This innovative system features steel panel building formwork with plywood facing and a prop equipped with an early stripping mechanism. The Green Formwork System offers enhanced efficiency and durability for construction projects.
| Model Number | Size(mm) | weight(kgs) |
| MB1812 | 1800x1200 | 45 |
| MB189 | 1800X900 | 39 |
| MB186 | 1800X600 | 31 |
| MB1512 | 1500X1200 | 41.4 |
| MB159 | 1500X900 | 33.3 |
| MB156 | 1500X600 | 25.8 |
| MB1212 | 1200X1200 | 34 |
| MB129 | 1200X900 | 28 |
| MB126 | 1200X600 | 23 |
| MB99 | 900X900 | 23 |
| MB96 | 900X600 | 19 |
| MB66 | 600X600 | 14.3 |
Product Description:
Product Description
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly and easily set up and remove the panels.
VERSATILE - The system can handle complex slab structures through the combination of panels, aux beams, and bridge beams in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for Q355b Steel Panel Building Formwork System projects.
Prima Construction FormworkShandong Prima Construction Formwork Co., Ltd. offers top-tier steel formwork panels for efficient construction projects.
Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- concrete formwork system
- Others concrete formwork system
- Concrete Slab Steel Construction Material Formwork Panels