Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shandong Prima's Green Formwork System offers efficient steel panel formwork for concrete slabs. Ideal for building construction projects.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring steel panel with plywood, and prop with early stripping mechanism. Ideal for concrete construction projects.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly set up and remove panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for our Steel Panel Ceiling Formwork System for concrete projects.