Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover our innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. Perfect for concrete slab and ceiling construction in building projects.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on steel frames and props with early stripping mechanisms.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT: With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS: A team of 3-4 workers can quickly set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for your building projects. Explore our Table Formwork System for efficient construction.