Customization: | Available |
---|---|
After-sales Service: | Quality Warranty |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the innovative Panel-Prop early stripping Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. This system, based on the concept of Green Construction, has been developed over 10 years to provide high efficiency and solid safety.
Experience the future of formwork with Green Formwork-- Panel-Prop Early Stripping System. Enhance your construction projects with efficiency and safety like never before.
Item | Item | specification | unit weight |
Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
MB189 | 1.8X0.9M | 37 | |
MB186 | 1.8X0.6M | 29 | |
MB1512 | 1.5X1.2M | 39.4 | |
MB159 | 1.5X0.9M | 31.3 | |
MB156 | 1.5X0.6M | 23.8 | |
MB1212 | 1.2X1.2M | 32 | |
MB129 | 1.2X0.9M | 26 | |
MB126 | 1.2X0.6M | 21 | |
MB99 | 0.9X0.9M | 21 | |
MB96 | 0.9X0.6M | 17 | |
MB66 | 0.6X0.6M | 12.3 |
Our Green Formwork, developed with technology from Canada's "TABLA," is a patented product that revolutionizes slab formwork. It is the most advanced, safest (with 6-direction fixed drop head mechanism), and fastest system globally. Our patents extend to the USA, Australia, China, Malaysia, and more.
We are the leading manufacturer and supplier of scaffolding and formwork systems in China. Our products meet international standards such as BS1139 and EN74/EN74B, ensuring top quality at competitive prices.
Explore our range of products including Ring system scaffolds, cup-lock system scaffolds, Kwikstage system scaffolds, Euro system scaffolds, scaffold frames, screw base jacks, formwork accessories, and more. Trust Shandong Prima for all your scaffolding and formwork needs!