• Building Material Slab Formwork Construction
  • Building Material Slab Formwork Construction
  • Building Material Slab Formwork Construction
  • Building Material Slab Formwork Construction
  • Building Material Slab Formwork Construction
  • Building Material Slab Formwork Construction

Building Material Slab Formwork Construction

Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Slab Formwork
Payment Term: 30% Deposit,70% Should Be Paid Before Shipment
Panel and Prop Raw Material: Q355b
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • Installation Instructions
  • Certifications
Overview

Basic Info.

Model NO.
GF
Trade Mark
GF
Color
Green/Customized Color
HS
8480600000
Transport Package
Bundle
Trademark
GF
Origin
China
HS Code
8480600000
Production Capacity
50000piece Per Year

Product Description

Shandong Prima's Steel Formwork System for early stripping. Ideal for concrete slab construction. Durable and efficient.
Product Description

Discover Green Formwork System by Shandong Prima: Panel with plywood on steel frame & Prop with early stripping mechanism. Ideal for efficient construction.

Building Material Slab Formwork Construction
Product Parameters
Model Number Size(mm) weight(kgs)
MB1812 1800x1200 45
MB189 1800X900 39
MB186 1800X600 31
MB1512 1500X1200 41.4
MB159 1500X900 33.3
MB156 1500X600 25.8
MB1212 1200X1200 34
MB129 1200X900 28
MB126 1200X600 23
MB99 900X900 23
MB96 900X600 19
MB66 600X600 14.3
Our Advantages



Product Description: SAFE Formwork System by Shandong Prima Construction Formwork Co., Ltd.



SAFE - The independent table with 6 directions moving restriction. It's a very stable system.



EFFICIENT - It includes only a few components, set and removal are very simple. With an early stripping mechanism, it can shorten the construction period and save your time.



REDUCED TOTAL COST - Thanks to the early stripping mechanism, the number of panels becomes less and the cost of transportation and storage is reduced.



MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.



Through the combination of panels, aux beams, and bridge beams, the system deals with complex slab structures in a very simple way.




Building Material Slab Formwork Construction
Packaging & Shipping
Building Material Slab Formwork Construction
Building Material Slab Formwork Construction
Building Material Slab Formwork Construction
Installation Instructions
Building Material Slab Formwork Construction
Certifications
Building Material Slab Formwork Construction
Building Material Slab Formwork Construction

Contact us at Shandong Prima Construction Formwork Co., Ltd. for Building Material Slab Formwork Construction projects.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
20000000 RMB
Plant Area
>2000 square meters