• Bamboo Aluminum Table Formwork for Construction
  • Bamboo Aluminum Table Formwork for Construction
  • Bamboo Aluminum Table Formwork for Construction
  • Bamboo Aluminum Table Formwork for Construction
  • Bamboo Aluminum Table Formwork for Construction
  • Bamboo Aluminum Table Formwork for Construction

Bamboo Aluminum Table Formwork for Construction

After-sales Service: Quality Warranty
Warranty: One Year
Certification: ISO
Material: Aluminum
Type: Slab Formwork
Frame Raw Material: Aluminum
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (25)
  • Overview
  • Product Description
  • Company Profile
  • Project Case
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
GF
Plywood Raw Material
Bamboo
Color
Orange/Customized Color
Surface Treatment
Powder Coating
Payment Term
T/T 30% as Deposit;70% Before Shipment
Delivery Date
15-30days
Transport Package
Bundle
Specification
1800x1200mm
Trademark
GF
Origin
China
HS Code
8480600000
Production Capacity
150000piece Per Year

Product Description

Product Description



Green Formwork System


Introducing the innovative Panel-Prop Early Stripping System by Shandong Prima Construction Formwork Co., Ltd. This system is designed based on the principles of Green Construction, offering efficiency and safety in formwork construction.



Key Features:



  • Puzzle-style system for easy erection, stripping, and removal

  • Consists of Panel with plywood faced on a steel frame, Prop with early stripping mechanism, and Assembly/Disassembly Tool

  • No braces required



Benefits:



  • High efficiency in construction process

  • Enhanced safety measures

  • Most advanced Early Stripping System globally



Experience the future of formwork construction with the Green Formwork System - Panel-Prop Early Stripping System.




Item Item specification unit weight
Aluminium Panel MB1812 1.8X1.2M 43
MB189 1.8X0.9M 37
MB186 1.8X0.6M 29
MB1512 1.5X1.2M 39.4
MB159 1.5X0.9M 31.3
MB156 1.5X0.6M 23.8
MB1212 1.2X1.2M 32
MB129 1.2X0.9M 26
MB126 1.2X0.6M 21
MB99 0.9X0.9M 21
MB96 0.9X0.6M 17
MB66 0.6X0.6M 12.3
Bamboo Aluminum Table Formwork for Construction

Introducing Our Green Formwork by Shandong Prima Construction Formwork Co., Ltd.



Our Green Formwork, featuring technology from Canada's "TABLA," is a patented product that revolutionizes slab formwork globally. With a unique drop head mechanism, it is the most advanced, safest (6-directions fixed), and fastest formwork available. Patented in the USA, Australia, China, Malaysia, and more, it offers unbeatable advantages:




  • SAFE: The independent table with 6-direction moving restriction ensures exceptional stability.

  • EFFICIENT: With minimal components, setup and removal are straightforward. The early stripping mechanism accelerates construction, achieving an erection speed of 60-100 square meters per person per day.

  • REDUCED TOTAL COST: The early stripping feature reduces the number of panels, cutting costs associated with transportation and storage.

  • MINIMUM OPERATORS: A team of 3-4 workers can swiftly set up and remove the panels with ease.

 
Company Profile
Bamboo Aluminum Table Formwork for Construction
Bamboo Aluminum Table Formwork for Construction

Welcome to Shandong Prima Construction Formwork Co., Ltd.



As the leading manufacturer and supplier of scaffolding and formwork systems in China, we pride ourselves on our advanced production capabilities. Our scaffolding couplers/clamps are meticulously crafted to meet BS1139(1982&1991) and EN74/EN74B standards, ensuring top-notch quality comparable to products made in the U.K. at a more competitive price.



Since 1993, we have been supplying the U.K. market and exporting to various European countries, Canada, the U.S.A., Brazil, Australia, and New Zealand. Our products are trusted globally in construction, power stations, petrochemical industries, and more, offering safe access solutions for projects of all sizes.



With official certifications from the U.K. and Australia, we offer a comprehensive range of scaffolding couplers/clamps, including forged, pressed, and cast carbon steel products. Our inventory also includes Ring system scaffolds, cup-lock system scaffolds, Kwikstage system scaffolds, Euro system scaffolds, scaffold frames, screw base jacks, formwork accessories, and construction tools.



In 2012, we expanded our offerings to include slab formwork, column/wall formwork, and more. Notably, our patented Green Formwork, featuring technology from Canada's "TABLA" with a drop head mechanism, is the world's most advanced, safest (6-directions fixed), and fastest slab formwork. This innovative product is patented in the USA, Australia, China, Malaysia, and beyond.

Project Case
Bamboo Aluminum Table Formwork for Construction
Bamboo Aluminum Table Formwork for Construction
Bamboo Aluminum Table Formwork for Construction
Packaging & Shipping
Bamboo Aluminum Table Formwork for Construction
Bamboo Aluminum Table Formwork for Construction
Bamboo Aluminum Table Formwork for Construction


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
20000000 RMB
Plant Area
>2000 square meters