Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Revolutionize construction with our steel panel formwork system for efficient building projects. Explore our early stripping concrete formwork for versatile solutions.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring steel panel formwork with plywood, prop with early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system can handle complex slab structures in a simple way.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for our Early Stripping Head Steel Panel System for your building projects.