Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shandong Prima's Green Formwork System offers efficient early stripping. Ideal for concrete slab construction, providing durability and ease of use.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring steel panel with plywood and prop with early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT - With only a few components, setting up and removing the system is simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, resulting in lower costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system can handle complex slab structures in a simple way.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact Shandong Prima Construction Formwork Co., Ltd. for Steel Panel Slab Formwork System for Building projects.