Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the efficient Steel Formwork solution by Shandong Prima. Ideal for Concrete Slab and Ceiling construction. Durable and reliable.
Discover the GF Early Stripping Table Formwork Panel by Shandong Prima. This innovative system consists of a steel-framed panel with plywood facing and props featuring an early stripping mechanism. Ideal for concrete slab construction.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT: With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs, transportation, and storage expenses.
MINIMUM OPERATORS: A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact us for our GF Early Stripping Table Formwork Panel for your construction projects.