Customization: | Available |
---|---|
After-sales Service: | Quality Warranty |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Green Formwork:
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel Formwork
Introducing the innovative Panel-Prop early stripping Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. This system, designed based on Green Construction principles and 10 years of research, features a puzzle-style mechanism for efficient and safe erection, stripping, and removal. It is the most advanced Early Stripping System globally, setting a new standard in construction efficiency and safety. Say hello to the future of formwork with Green Formwork-- Panel-Prop Early Stripping System.
The Green Formwork System comprises three key components that eliminate the need for braces:
Item | Item | specification | unit weight |
Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
MB189 | 1.8X0.9M | 37 | |
MB186 | 1.8X0.6M | 29 | |
MB1512 | 1.5X1.2M | 39.4 | |
MB159 | 1.5X0.9M | 31.3 | |
MB156 | 1.5X0.6M | 23.8 | |
MB1212 | 1.2X1.2M | 32 | |
MB129 | 1.2X0.9M | 26 | |
MB126 | 1.2X0.6M | 21 | |
MB99 | 0.9X0.9M | 21 | |
MB96 | 0.9X0.6M | 17 | |
MB66 | 0.6X0.6M | 12.3 |
Our Green Formwork, featuring technology from Canada's "TABLA," is a patented product that revolutionizes slab formwork globally. With a drop head mechanism, it is the most advanced, safest (6 directions fixed), and fastest formwork available. Patented in the USA, Australia, China, Malaysia, and more, it offers unbeatable advantages:
As the leading manufacturer and supplier of scaffolding and formwork systems in China, we pride ourselves on delivering top-quality products at competitive prices.
Trust Shandong Prima Construction Formwork Co., Ltd. for all your scaffolding, construction, and formwork needs. Contact us today for high-quality products that meet international standards.