Customization: | Available |
---|---|
After-sales Service: | Quality Warranty |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. This system is designed based on the principles of Green Construction and has been developed over a decade of research.
The Panel-Prop formwork system features an early stripping mechanism, allowing for efficient erection, stripping, and removal with solid safety measures in place. It is a puzzle-style system that is not only highly efficient but also the most advanced Early Stripping System globally.
The Green Formwork System consists of three key components that do not require braces:
Experience the future of formwork with the Green Formwork System - Panel-Prop Early Stripping System, setting new standards in construction efficiency and safety.
Item | Item | specification | unit weight |
Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
MB189 | 1.8X0.9M | 37 | |
MB186 | 1.8X0.6M | 29 | |
MB1512 | 1.5X1.2M | 39.4 | |
MB159 | 1.5X0.9M | 31.3 | |
MB156 | 1.5X0.6M | 23.8 | |
MB1212 | 1.2X1.2M | 32 | |
MB129 | 1.2X0.9M | 26 | |
MB126 | 1.2X0.6M | 21 | |
MB99 | 0.9X0.9M | 21 | |
MB96 | 0.9X0.6M | 17 | |
MB66 | 0.6X0.6M | 12.3 |
Our Green Formwork, developed with technology from Canada's "TABLA," is a patented product that revolutionizes slab formwork. It is the most advanced, safest (with 6-direction fixed movement), and fastest formwork globally. Our patents extend to the USA, Australia, China, Malaysia, and more.
As the leading manufacturer and supplier of scaffolding and formwork systems in China, we pride ourselves on our advanced production techniques and high-quality products.
Our products are trusted worldwide in construction, power stations, petrochemical and oil industries, and more where safe access is essential.