Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. Perfect for concrete slab and ceiling construction.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring panels with plywood on a steel frame and props with an early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT - This system includes only a few components, making set-up and removal simple. With an early stripping mechanism, it can shorten the construction period and save time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels needed, resulting in cost, transportation, and storage savings.
MINIMUM OPERATORS - A team of 3-4 workers can quickly and easily set up and remove the panels.
VERSATILE - By combining panels, aux beams, and bridge beams, this system can handle complex slab structures in a straightforward manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact us for your concrete table formwork projects at Shandong Prima Construction Formwork Co., Ltd.