Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Explore our Green Formwork System by Shandong Prima. Ideal for slab and ceiling construction, this steel formwork ensures efficiency and durability.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. Featuring steel panel construction with plywood facing and prop with early stripping mechanism.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT: This system includes only a few components, making set-up and removal simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS: With only 3-4 workers, setting up and removing panels is quick and easy.
Through the combination of panels, aux beams, and bridge beams, this system can handle complex slab structures in a simple way.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact us for your steel panel concrete formwork construction projects. Shandong Prima Construction Formwork Co., Ltd. is here to assist you.