Customization: | Available |
---|---|
Warranty: | One Year |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Discover the innovative Green Formwork System by Shandong Prima. Ideal for efficient and sturdy concrete slab construction projects.
Discover the Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. featuring a panel with plywood on a steel frame and a prop with early stripping mechanism. Ideal for concrete construction.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE: The independent table with 6 directions moving restriction ensures a very stable system.
EFFICIENT: With only a few components, set up and removal are simple. The early stripping mechanism shortens the construction period, saving time.
REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS: A team of 3-4 workers can quickly and easily set up and remove the panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact us for your concrete slab formwork system projects at Shandong Prima Construction Formwork Co., Ltd.