Warranty: | One Year |
---|---|
Certification: | ISO, CE |
Material: | Steel |
Type: | Slab Formwork |
Payment Term: | 30% Deposit,70% Should Be Paid Before Shipment |
Panel and Prop Raw Material: | Q355b |
Customization: |
---|
Suppliers with verified business licenses
Steel formwork system for early stripping. Ideal for concrete ceiling and slab construction. Durable and efficient solution by Shandong Prima Construction Formwork Co., Ltd.
Discover the 3 key elements of the Q355b Ceiling Formwork for Construction: a steel-framed panel with plywood, prop with early stripping mechanism, and efficient building material solution.
Model Number | Size(mm) | weight(kgs) |
MB1812 | 1800x1200 | 45 |
MB189 | 1800X900 | 39 |
MB186 | 1800X600 | 31 |
MB1512 | 1500X1200 | 41.4 |
MB159 | 1500X900 | 33.3 |
MB156 | 1500X600 | 25.8 |
MB1212 | 1200X1200 | 34 |
MB129 | 1200X900 | 28 |
MB126 | 1200X600 | 23 |
MB99 | 900X900 | 23 |
MB96 | 900X600 | 19 |
MB66 | 600X600 | 14.3 |
SAFE - The independent table with 6 directions moving restriction provides a very stable system.
EFFICIENT - With only a few components, set up and removal are simple. The early stripping mechanism shortens construction periods, saving time.
REDUCED TOTAL COST - The early stripping mechanism reduces the number of panels, lowering costs for transportation and storage.
MINIMUM OPERATORS - A team of 3-4 workers can quickly set up and remove panels.
Through the combination of panels, aux beams, and bridge beams, the system efficiently handles complex slab structures in a simple manner.
Company Name: Shandong Prima Construction Formwork Co., Ltd.
Contact us for our Q355b Ceiling Formwork for your construction projects.
Suppliers with verified business licenses